CCCL — ESSA - Special Events (Melanie Walters)
1455 Scenic Gulf Dr,Miramar Beach,FL,32550-6930
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 8/10/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_CCCLCaptured FDEP_CCCL_ESE1083306 from fdep_cccl
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | G2C Sand Mine | Niceville | 24.0 mi | 47.9 |
| sand pit | MVM Landfill, LLC | DeFuniak Springs | 24.5 mi | 49.1 |
| sand pit | MOSSEYHEAD MINES | CENTURY | 25.7 mi | 51.4 |
| sand pit | Mossy Head West | Dothan | 25.7 mi | 51.4 |
| sand pit | River Road Pit | Navarre | 29.4 mi | 58.8 |
| sand pit | Quikrete Mine | MILTON | 41.6 mi | 83.2 |
| sand pit | Sandhills Plant 2 | Dothan | 42.1 mi | 84.1 |
| sand pit | Panama City Quarry | Murfresboro | 49.6 mi | 99.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cccl | FDEP_CCCL_ESE1083306 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/70f4cbbe