Approved · unknownPINELLAS County
Cleanup (petroleum cleanup) — 7-ELEVEN FOOD STORE #27080
2030 GULF TO BAY BLVD, CLEARWATER, FL, 33765
~186loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of May 28, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — 7-ELEVEN FOOD STORE #27080
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.7449 ac
Parcel 182887
Est truck loads
—
Needs site plan parse
Sources seen
4
Public records referencing this job
Why this is a hauling opportunity: FDEP petroleum cleanup site — active remediation. Active cleanups typically require contaminated-soil hauling to disposal.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87800288 from fdep_cleanup_sites
- 2026-06-10FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87922961 from fdep_cleanup_sites
- 2026-06-11PCPAOCaptured PCPAO_182887_d867e210 from pcpao
- 2026-06-11PCPAOCaptured PCPAO_182887_6f7acf18 from pcpao
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (transfer station)
CITY OF CLEARWATER TRANSFER STATION · Clearwater
One-way
1.7 mi
Round trip
3.3 mi
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
19.1 mi
Round trip
38.2 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 19.1 mi | 38.2 |
| quarry | Caloosa Materials | Ruskin | 26.2 mi | 52.3 |
| quarry | Central State Aggregates LLC | Zephyrhill | 32.6 mi | 65.2 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 33.5 mi | 67 |
| sand pit | County Line Mine | Spring Hill | 34.5 mi | 68.9 |
| quarry | Brooksville Quarry | Brooksville | 47.0 mi | 93.9 |
| quarry | Brooksville South Cement Plant | Brooksville | 47.6 mi | 95.2 |
| transfer station | CITY OF CLEARWATER TRANSFER STATION | Clearwater | 1.7 mi | 3.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87800288 | 2026-05-28 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87922961 | 2026-06-10 | Open ↗ |
| pcpao | PCPAO_182887_d867e210 | 2026-06-11 | Open ↗ |
| pcpao | PCPAO_182887_6f7acf18 | 2026-06-11 | Open ↗ |
Parcel Detail
Pinellas County Property Appraiser
PropertyPCPAO ↗
- Folio
- 182887
- Strap
- 13-29-15-00000-130-0400
- Address
- 2030 Gulf To Bay Blvd
- Zip
- 33765
- Acreage
- 0.7449 ac
- Sq ft
- 32,448
- Year built
- 1987
- Use
- 1122 Convenience St ...
- Subdivision
- NONE
Owner of record
MDC ENDEAVOUR 1 LLC
Last sale
2024-11-01
$2,613,000
Appraiser valuation
- Just (market)
- $1,125,000
- Assessed
- $1,125,000
- Taxable
- $1,125,000
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/6f7acf18