Leads/6e3c2f91
Approved · unknown

Coastal Env — Other Major Non-Habitable (St. Lucie Inlet Dredging)

Stuart

Load estimate pending
Lifecycle
Filed as of Jul 31, 1995
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

Coastal Env — Other Major Non-Habitable (St. Lucie Inlet Dredging)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDEP coastal permit (coastal_env) — Other Major Non-Habitable. Coastal armor / sand / fill projects typically move 10K-1M+ cy.

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_COASTAL_ENV
    Captured FDEP_COASTAL_ENV_WQC-00024 from fdep_coastal_env

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
Palm City Mine · Greenacres
One-way
11.5 mi
Round trip
23.1 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitPalm City MineGreenacres11.5 mi23.1~55m$140–$175
sand pitMC320 MinePalm City17.4 mi34.8~75m$175–$230
quarry1412 Canal PointHammond21.6 mi43.2~75m$175–$230
quarryFort Pierce MineJacksonville22.4 mi44.7~75m$175–$230
quarryFive Stones Mine, LLC.Tinton Falls31.2 mi62.5~100m$230–$290
quarryCapron Trails MineJupiter31.8 mi63.7~100m$230–$290
quarryPalm Beach Aggregates LLCJacksonville33.4 mi66.7~100m$230–$290
sand pitBlue Goose MineFort Pierce42.7 mi85.3~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_coastal_envFDEP_COASTAL_ENV_WQC-000242026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/6e3c2f91