Approved · application_filedCitrus County
Crystal Ridge Phase 3
SWFWMD ERP — site address pending
Load estimate pending
Lifecycle
- Filed
- Permitted
- Active
- Completed
Paperwork in — not yet approved
Location
The workspace from above — satellite by default
Crystal Ridge Phase 3
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Crystal Ridge Property Group, LLC
Why this is a hauling opportunity: Base unknown/other (20)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-17SWFWMD_ERPCaptured SWFWMD_ERP_934589 from swfwmd_erp
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Maylen Mine · Crystal River
One-way
2.3 mi
Round trip
4.6 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Maylen Mine | Crystal River | 2.3 mi | 4.6 |
| quarry | Lecanto Mine | Crystal River | 3.9 mi | 7.7 |
| quarry | Amrize Crystal River Quarry | CRYSTAL RIVER | 4.8 mi | 9.6 |
| quarry | Red Level Mine | Crystal River | 9.7 mi | 19.4 |
| quarry | Manko Co Sec 5 Mine/Phos | Ocala | 10.1 mi | 20.3 |
| quarry | Inglis Quarry | Brooksville | 13.8 mi | 27.6 |
| quarry | Calcium Plant | Jacksonville | 16.3 mi | 32.7 |
| quarry | Center Hill Mine | Brooksville | 18.4 mi | 36.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Developer
Crystal Ridge Property Group, LLC
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| swfwmd_erp | SWFWMD_ERP_934589 | 2026-05-17 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Citrus
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/6e0b81b5