Approved · unknownHILLSBOROUGH County
Cleanup (petroleum cleanup) — TAMPA SUPER STOP
3401 E LAKE AVE, TAMPA, FL, 33610
~12loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of Jun 15, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — TAMPA SUPER STOP
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.046 ac
Parcel 1739550000
Est truck loads
—
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
JAYDEN AND NAVEEN LLC
Why this is a hauling opportunity: FDEP petroleum cleanup site — active remediation. Active cleanups typically require contaminated-soil hauling to disposal.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-06-16FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87985366 from fdep_cleanup_sites
- 2026-06-21HCPACaptured HCPA_1739550000_6d736866 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
3.1 mi
Round trip
6.3 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 3.1 mi | 6.3 |
| quarry | Central State Aggregates LLC | Zephyrhill | 17.4 mi | 34.9 |
| quarry | Caloosa Materials | Ruskin | 19.0 mi | 38 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 28.5 mi | 57 |
| quarry | Four Corners | Lithia | 31.3 mi | 62.5 |
| sand pit | County Line Mine | Spring Hill | 32.7 mi | 65.3 |
| quarry | South Pasture Mine | Lithia | 37.0 mi | 73.9 |
| quarry | Wingate Creek Mine | Lithia | 37.8 mi | 75.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Developer
JAYDEN AND NAVEEN LLC
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87985366 | 2026-06-16 | Open ↗ |
| hcpa | HCPA_1739550000_6d736866 | 2026-06-21 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 1739550000
- Strap
- A-08-29-19-4NA-000001-00001.0
- Address
- 3401 E LAKE AVE, TAMPA
- Zip
- 33610
- Acreage
- 0.046 ac
- Sq ft
- 2,011
- Homestead
- NO
Owner of record
JAYDEN AND NAVEEN LLC
Last sale
2021-12-13
$100(transfer)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/6d736866