Leads/6ba04147
Approved · planning

CONSTRUCT A PRIVATE GARAGE

2116 PALMETTO STREET, CLEARWATER, FL, 33765

Load estimate pending
Lifecycle
Permitted as of Sep 5, 2018
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CONSTRUCT A PRIVATE GARAGE

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
DANIEL VICKSTROM
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, but stale (7y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21FDEP_ERP
    Captured FDEP_ERP_0368357-001-EG from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
19.0 mi
Round trip
37.9 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryTampa Cement Grinding PlantTampa19.0 mi37.9~75m$175–$230
quarryCaloosa MaterialsRuskin26.7 mi53.4~100m$230–$290
quarryCentral State Aggregates LLCZephyrhill31.8 mi63.7~100m$230–$290
quarryGeorgia Stone Spring Hill QuarryAtlanta 32.4 mi64.9~100m$230–$290
sand pitCounty Line MineSpring Hill33.4 mi66.7~100m$230–$290
quarryBrooksville QuarryBrooksville45.9 mi91.8~130m$290–$370
quarryBrooksville South Cement PlantBrooksville46.5 mi93.1~130m$290–$370
quarryCalcium PlantJacksonville49.6 mi99.1~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
DANIEL VICKSTROM

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0368357-001-EG2026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/6ba04147