USACE 404 — 13231 EASTERN AVENUE
13231 EASTERN AVE, PALMETTO, FL, 34221
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 1/16/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_SPGPCaptured FDEP_SPGP_0168124-031-EM from fdep_spgp
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 9.0 mi | 17.9 |
| quarry | Tampa Cement Grinding Plant | Tampa | 22.4 mi | 44.7 |
| quarry | Wingate Creek Mine | Lithia | 28.2 mi | 56.5 |
| quarry | Four Corners | Lithia | 37.2 mi | 74.5 |
| quarry | South Pasture Mine | Lithia | 37.5 mi | 75 |
| quarry | Central State Aggregates LLC | Zephyrhill | 42.9 mi | 85.7 |
| quarry | South Fort Meade Mine | Lithia | 49.3 mi | 98.6 |
| quarry | Florida Shell & Fill Company LLC | Naples | 49.1 mi | 98.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_spgp | FDEP_SPGP_0168124-031-EM | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- MANATEE
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/6b6f719f