Approved · unknownCitrus County
FDOT — US19/US98/SR55/N SUNCOAST BLVD FR S OF NE 1ST TERR TO S OF S NUG HARBOR - RESURFACING
Citrus County — FDOT Contract T7567
Load estimate pending
Lifecycle
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — US19/US98/SR55/N SUNCOAST BLVD FR S OF NE 1ST TERR TO S OF S NUG HARBOR - RESURFACING
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$4.4M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — US19/US98/SR55/N SUNCOAST BLVD FR S OF NE 1ST TERR TO S OF S NUG HARBOR - RESURF. Vendor: SUPERIOR ASPHALT, INC.. Cost: $4,438,001. | FDOT public project (+15) | size signal: $4,438,001 valuation (+12) | FDOT public project (+15) | size signal: $4,438,001 valuation (+12) | FDOT public project (+15) | size signal: $4,438,001 valuation (+12) | FDOT public project (+15) | size signal: $4,438,001 valuation (+12) | FDOT public project (+15) | size signal: $4,438,001 valuation (+12) | FDOT public project (+15) | size signal: $4,438,001 valuation (+12)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_T7567_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Amrize Crystal River Quarry · CRYSTAL RIVER
One-way
0.3 mi
Round trip
0.6 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Amrize Crystal River Quarry | CRYSTAL RIVER | 0.3 mi | 0.6 |
| quarry | Red Level Mine | Crystal River | 5.3 mi | 10.6 |
| quarry | Maylen Mine | Crystal River | 5.6 mi | 11.2 |
| quarry | Lecanto Mine | Crystal River | 8.4 mi | 16.7 |
| quarry | Inglis Quarry | Brooksville | 9.4 mi | 18.9 |
| quarry | Manko Co Sec 5 Mine/Phos | Ocala | 11.7 mi | 23.4 |
| quarry | Calcium Plant | Jacksonville | 20.6 mi | 41.2 |
| quarry | Center Hill Mine | Brooksville | 22.9 mi | 45.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_T7567_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Citrus
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/694ae58b