Leads/692f9e5b
Approved · unknownHERNANDO County

USACE 404 — 6688 SMITHFIELD AVE, SPRING HILL

6688 SMITHFIELD AVENUE, SPRING HILL, FL, 34609

Load estimate pending
Lifecycle
Permitted as of Jan 20, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 6688 SMITHFIELD AVE, SPRING HILL

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base public_works/earthwork (65) | stage=permit_issued, recent (+10) | single-trade residential permit — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0464454-001-EI from fdep_spgp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Brooksville Quarry · Brooksville
One-way
5.0 mi
Round trip
10 mi · ~40 min
Rate / load
$110–$140
TypeNameCityOne-wayRT mi~CycleRate / load
quarryBrooksville QuarryBrooksville5.0 mi10~40m$110–$140
quarryBrooksville South Cement PlantBrooksville5.9 mi11.7~40m$110–$140
sand pitCounty Line MineSpring Hill7.9 mi15.9~40m$110–$140
quarryCalcium PlantJacksonville8.6 mi17.1~40m$110–$140
quarryGeorgia Stone Spring Hill QuarryAtlanta 9.6 mi19.3~40m$110–$140
quarryCenter Hill MineBrooksville12.5 mi25~55m$140–$175
quarryLecanto MineCrystal River19.9 mi39.9~75m$175–$230
quarryWest Florida AggregateWebster21.9 mi43.8~75m$175–$230
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hernando County Permits
Spring Hill / Brooksville Building
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0464454-001-EI2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
HERNANDO
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/692f9e5b