USACE 404 — 7155 LALENAIRE DRIVE
7156 LA LENAIRE DRIVE, LONGBOAT KEY, FL, 34228
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 3/19/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_SPGPCaptured FDEP_SPGP_0336456-008-EM from fdep_spgp
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 23.1 mi | 46.2 |
| quarry | Wingate Creek Mine | Lithia | 34.4 mi | 68.9 |
| quarry | Tampa Cement Grinding Plant | Tampa | 36.8 mi | 73.6 |
| quarry | Florida Shell & Fill Company LLC | Naples | 40.3 mi | 80.7 |
| quarry | South Pasture Mine | Lithia | 47.1 mi | 94.1 |
| quarry | Four Corners | Lithia | 48.7 mi | 97.5 |
| landfill | 63RD AVENUE EAST WASTE PROCESSING FACILITY | Bradenton | 8.7 mi | 17.3 |
| landfill | RECOMMUNITY HOLDINGS LP (FKA RRS/FCR) | Sarasota | 10.5 mi | 21.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_spgp | FDEP_SPGP_0336456-008-EM | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- MANATEE
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/67ef803d