Leads/64d02dad
Approved · planning

TYSON'S CARWASH

8309 W HILLSBOROUGH AVE, TAMPA, FL, 33615

Load estimate pending
Lifecycle
Permitted as of Jun 29, 2018
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

TYSON'S CARWASH

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
RAVI ALUR
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, but stale (8y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21FDEP_ERP
    Captured FDEP_ERP_0366128-001-EG from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
9.2 mi
Round trip
18.4 mi · ~40 min
Rate / load
$110–$140
TypeNameCityOne-wayRT mi~CycleRate / load
quarryTampa Cement Grinding PlantTampa9.2 mi18.4~40m$110–$140
quarryCaloosa MaterialsRuskin22.0 mi43.9~75m$175–$230
quarryCentral State Aggregates LLCZephyrhill22.3 mi44.6~75m$175–$230
quarryGeorgia Stone Spring Hill QuarryAtlanta 27.4 mi54.8~100m$230–$290
sand pitCounty Line MineSpring Hill30.1 mi60.1~100m$230–$290
quarryFour CornersLithia40.3 mi80.7~130m$290–$370
quarryBrooksville QuarryBrooksville41.3 mi82.6~130m$290–$370
quarryBrooksville South Cement PlantBrooksville41.7 mi83.5~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
RAVI ALUR

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0366128-001-EG2026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/64d02dad