Leads/62a2c2ef
Approved · unknownPASCO County

USACE 404 — 6828 RIVER RD [DOCK]

6828 RIVER RD, NEW PORT RICHEY, FL, 34652

~120loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of May 28, 2019
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 6828 RIVER RD [DOCK]

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 5/28/2019 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
0.48 ac
Parcel 05-26-16-0030-20000-0110
Est truck loads
Needs site plan parse
Sources seen
4
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
KINNARD KELVIN M & CAROL L
Why this is a hauling opportunity: Base public_works/earthwork (65) | size signal: ~120 est. loads (+12) | stage=permit_issued, but stale (7y old) | homeowner-scale dock/seawall — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0376623-001-EE from fdep_spgp
  2. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0351539-001-EE from fdep_spgp
  3. 2026-06-03PASCOPA
    Captured PASCOPA_05-26-16-0030-20000-0110_62a2c2ef from pascopa
  4. 2026-06-03PASCOPA
    Captured PASCOPA_05-26-16-0030-20000-0110_c5ec8a8c from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
15.3 mi
Round trip
30.6 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill15.3 mi30.6
quarryGeorgia Stone Spring Hill QuarryAtlanta 16.8 mi33.6
quarryCentral State Aggregates LLCZephyrhill26.2 mi52.5
quarryTampa Cement Grinding PlantTampa27.9 mi55.9
quarryBrooksville QuarryBrooksville28.3 mi56.6
quarryBrooksville South Cement PlantBrooksville29.1 mi58.2
quarryCalcium PlantJacksonville31.8 mi63.5
quarryCenter Hill MineBrooksville35.6 mi71.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
KINNARD KELVIN M & CAROL L

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0376623-001-EE2026-05-28Open ↗
fdep_spgpFDEP_SPGP_0351539-001-EE2026-05-28Open ↗
pascopaPASCOPA_05-26-16-0030-20000-0110_62a2c2ef2026-06-03Open ↗
pascopaPASCOPA_05-26-16-0030-20000-0110_c5ec8a8c2026-06-03Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
05-26-16-0030-20000-0110
Strap
05-26-16-0030-20000-0110
Address
6828 RIVER ROAD, NEW PORT RICHEY
Zip
34652
Acreage
0.48 ac
Sq ft
20,909
Owner of record
KINNARD KELVIN M & CAROL L
Last sale

No sale on record

Appraiser valuation
Just (market)
$590,284

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/62a2c2ef