Leads/6250-2nd-ave-n-pinellas-fl-f58cd462
Approved · unknownPinellas County

6250 2ND AVE N

6250 2ND AVE N

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

6250 2ND AVE N

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.1458 ac
Parcel 26988
Est truck loads
Needs site plan parse
Sources seen
5
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
FILTZ, MICHAEL J
Why this is a hauling opportunity: Building permit | Connector base: 50 | single-trade residential permit — capped low | individual owner, residential scale — capped low | single-trade residential permit — capped low | individual owner, residential scale — capped low | single-trade residential permit — capped low | individual owner, residential scale — capped low | single-trade residential permit — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21STPETE_CLICK2GOV
    Captured 21-06001100 from stpete_click2gov
  2. 2026-05-21PCPAO
    Captured PCPAO_28521_51505da9 from pcpao
  3. 2026-05-22PCPAO
    Captured PCPAO_28219_51505da9 from pcpao
  4. 2026-05-25PCPAO
    Captured PCPAO_28511_51505da9 from pcpao
  5. 2026-05-27PCPAO
    Captured PCPAO_26988_51505da9 from pcpao

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
17.9 mi
Round trip
35.8 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin17.9 mi35.8
quarryTampa Cement Grinding PlantTampa20.5 mi40.9
quarryCentral State Aggregates LLCZephyrhill39.5 mi79.1
quarryWingate Creek MineLithia41.2 mi82.5
quarryGeorgia Stone Spring Hill QuarryAtlanta 44.7 mi89.3
quarryFour CornersLithia45.9 mi91.8
sand pitCounty Line MineSpring Hill46.5 mi93
quarrySouth Pasture MineLithia48.2 mi96.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
FILTZ, MICHAEL J
Applicant
DAN MCCULLERS

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
stpete_click2gov21-060011002026-05-21Open ↗
pcpaoPCPAO_28521_51505da92026-05-21Open ↗
pcpaoPCPAO_28219_51505da92026-05-22Open ↗
pcpaoPCPAO_28511_51505da92026-05-25Open ↗
pcpaoPCPAO_26988_51505da92026-05-27Open ↗

Parcel Detail

Pinellas County Property Appraiser

PropertyPCPAO
Folio
28521
Strap
20-31-16-14670-003-0060
Address
6250 2nd Ave N
Zip
33710
Acreage
0.1458 ac
Sq ft
6,351
Year built
1960
Use
0110 Single Family ...
Subdivision
CENTRAL PASADENA
Owner of record
FILTZ, MICHAEL J
Last sale
1980-12-01
$35,000
Appraiser valuation
Just (market)
$227,432
Assessed
$146,166
Taxable
$146,166

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/6250-2nd-ave-n-pinellas-fl-f58cd462