Leads/6218-palma-del-mar-blvd-s-pinellas-fl-e4e0aba6
Approved · unknownPinellas County

6218 PALMA DEL MAR BLVD S

6218 PALMA DEL MAR BLVD S

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

6218 PALMA DEL MAR BLVD S

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Parcel 08-32-16-65854-003-2070
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
6218 PALMA DEL MAR BLVD S 207
Why this is a hauling opportunity: Building permit | Connector base: 50

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-31STPETE_CLICK2GOV
    Captured 04-09001190 from stpete_click2gov

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (transfer station)
A & S OIL RECOVERY OF FLORIDA INC · St Petersburg
One-way
3.8 mi
Round trip
7.5 mi · ~25 min
Rate / load
$85–$110
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
16.7 mi
Round trip
33.4 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryCaloosa MaterialsRuskin16.7 mi33.4~75m$175–$230
quarryTampa Cement Grinding PlantTampa22.7 mi45.5~75m$175–$230
quarryWingate Creek MineLithia38.9 mi77.8~100m$230–$290
quarryCentral State Aggregates LLCZephyrhill42.6 mi85.2~130m$290–$370
quarryFour CornersLithia45.5 mi91~130m$290–$370
quarrySouth Pasture MineLithia47.0 mi94~130m$290–$370
quarryGeorgia Stone Spring Hill QuarryAtlanta 48.7 mi97.3~130m$290–$370
transfer stationA & S OIL RECOVERY OF FLORIDA INCSt Petersburg3.8 mi7.5~25m$85–$110
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Applicant
6218 PALMA DEL MAR BLVD S 207

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
stpete_click2gov04-090011902026-05-31Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
08-32-16-65854-003-2070
County
Pinellas
City
St. Petersburg
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/6218-palma-del-mar-blvd-s-pinellas-fl-e4e0aba6