State 404 — TYSON RESERVE
1675 NORA TYSON RD, SAINT CLOUD, FL, 34771
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 7/17/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_STATE404Captured FDEP_ST404_0429113-001-SFI from fdep_state404
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | S & L Materials Inc | KISSIMMEE | 19.0 mi | 38.1 |
| quarry | FLINT PLANT | Davenport | 22.2 mi | 44.4 |
| quarry | Beeline Mine | Orlando | 22.2 mi | 44.4 |
| sand pit | Davenport Sand Mine | Brooksville | 22.5 mi | 45 |
| sand pit | SILICA PLANT | Davenport | 22.7 mi | 45.4 |
| quarry | Buck Hammock | Orlando | 23.3 mi | 46.6 |
| sand pit | Haines City Mine | Davenport | 24.6 mi | 49.3 |
| sand pit | Cypress Sand | Lexington | 27.0 mi | 54.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_state404 | FDEP_ST404_0429113-001-SFI | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- OSCEOLA
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/61d7325d