Approved · unknown
Asphalt Plant — OKALOOSA ASPHALT,INC.
HWY.20 , 2 MI. W.OF FREEPORT, FREEPORT, FL
Load estimate pending
Lifecycle
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
Asphalt Plant — OKALOOSA ASPHALT,INC.
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: Asphalt Plant INACTIVE (shutdown unknown).
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_ARMS_FACILITIESCaptured FDEP_ARMS_7770020 from fdep_arms_facilities
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (landfill)
FREEPORT C&D DISPOSAL FACILITY · Freeport
One-way
0.5 mi
Round trip
1 mi
Closest import source (sand pit)
MVM Landfill, LLC · DeFuniak Springs
One-way
11.3 mi
Round trip
22.6 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | MVM Landfill, LLC | DeFuniak Springs | 11.3 mi | 22.6 |
| sand pit | Mossy Head West | Dothan | 18.2 mi | 36.3 |
| sand pit | MOSSEYHEAD MINES | CENTURY | 18.2 mi | 36.3 |
| sand pit | G2C Sand Mine | Niceville | 24.2 mi | 48.4 |
| sand pit | Sandhills Plant 2 | Dothan | 30.0 mi | 60.1 |
| sand pit | Panama City Quarry | Murfresboro | 35.7 mi | 71.3 |
| sand pit | River Road Pit | Navarre | 41.7 mi | 83.5 |
| landfill | FREEPORT C&D DISPOSAL FACILITY | Freeport | 0.5 mi | 1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_arms_facilities | FDEP_ARMS_7770020 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/6177c990