Leads/61630bda
Approved · unknown

Asphalt Plant — PARA EXCAVATING, INC.

W PARK AVE & RAILROAD AVE., EDGEWATER, FL, 32070

Load estimate pending
Lifecycle
Completed as of Jun 1, 1992
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

Asphalt Plant — PARA EXCAVATING, INC.

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base unknown/other (20) | earthwork keywords (+25)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_ARMS_FACILITIES
    Captured FDEP_ARMS_1270077 from fdep_arms_facilities

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
CITY OF EDGEWATER SOLID WASTE TRANSFER STATION · Edgewater
One-way
0.4 mi
Round trip
0.8 mi
Closest import source (quarry)
Beeline Mine · Orlando
One-way
33.8 mi
Round trip
67.7 mi
TypeNameCityOne-wayRT mi
quarryBeeline MineOrlando33.8 mi67.7
quarryRock Solid Rock, LLCTitusville36.5 mi73.1
quarryS & L Materials IncKISSIMMEE36.9 mi73.8
transfer stationCITY OF EDGEWATER SOLID WASTE TRANSFER STATIONEdgewater0.4 mi0.8
landfillSAMSULA LANDFILLNew Smyrna Beach9.4 mi18.8
landfill4 JAYS LANDFILL, LLCNew Smyrna Beach9.6 mi19.2
landfillTOMOKA FARMS ROAD LANDFILLPort Orange14.5 mi28.9
transfer stationOSCEOLA RD SOLID WASTE MGMT FACILITY-CLASS I LANDFILLGeneva17.3 mi34.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_arms_facilitiesFDEP_ARMS_12700772026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/61630bda