Approved · unknownMartin County
FDOT — BRIDGE REPLACEMENT - 890083 (SR 91) (MP 138) MARTIN COUNTY - BRIDGE REPLACEMENT
Martin County — FDOT Contract E8V48
Load estimate pending
Lifecycle
Active as of Sep 30, 2025
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
FDOT — BRIDGE REPLACEMENT - 890083 (SR 91) (MP 138) MARTIN COUNTY - BRIDGE REPLACEMENT
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$42.5M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — BRIDGE REPLACEMENT - 890083 (SR 91) (MP 138) MARTIN COUNTY - BRIDGE REPLACEMENT. Vendor: VECELLIO & GROGAN, INC.. Cost: $42,536,073. | FDOT public project (+15) | size signal: $42,536,073 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $42,536,073 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $42,536,073 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $42,536,073 valuation (+20) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E8V48_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (sand pit)
Palm City Mine · Greenacres
One-way
9.1 mi
Round trip
18.3 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Palm City Mine | Greenacres | 9.1 mi | 18.3 |
| quarry | Fort Pierce Mine | Jacksonville | 11.3 mi | 22.6 |
| sand pit | MC320 Mine | Palm City | 12.6 mi | 25.2 |
| quarry | 1412 Canal Point | Hammond | 13.2 mi | 26.4 |
| quarry | Capron Trails Mine | Jupiter | 23.7 mi | 47.5 |
| quarry | Five Stones Mine, LLC. | Tinton Falls | 24.4 mi | 48.8 |
| quarry | Palm Beach Aggregates LLC | Jacksonville | 33.9 mi | 67.9 |
| sand pit | Blue Goose Mine | Fort Pierce | 35.7 mi | 71.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E8V48_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Martin
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/613ac0a8