Leads/5f8a057c
Approved · unknown

CCCL — ESSA - Special Events (Cheri Peebles)

253 Sandtrap Rd,Miramar Beach,FL,32550-4158

Load estimate pending
Lifecycle
Permitted as of Aug 31, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CCCL — ESSA - Special Events (Cheri Peebles)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 8/31/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_CCCL
    Captured FDEP_CCCL_ESE1091277 from fdep_cccl

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
MVM Landfill, LLC · DeFuniak Springs
One-way
23.9 mi
Round trip
47.8 mi
TypeNameCityOne-wayRT mi
sand pitMVM Landfill, LLCDeFuniak Springs23.9 mi47.8
sand pitG2C Sand MineNiceville24.8 mi49.6
sand pitMOSSEYHEAD MINESCENTURY25.8 mi51.6
sand pitMossy Head WestDothan25.8 mi51.6
sand pitRiver Road PitNavarre31.0 mi61.9
sand pitSandhills Plant 2Dothan40.5 mi81.1
sand pitQuikrete MineMILTON43.2 mi86.4
sand pitPanama City QuarryMurfresboro48.2 mi96.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_ccclFDEP_CCCL_ESE10912772026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/5f8a057c