Joint Coastal Permit — joint_coastal_permit (Franklin County Board of Commissioners)

Alligator Point

Load estimate pending
Lifecycle
Permitted as of Oct 3, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Joint Coastal Permit — joint_coastal_permit (Franklin County Board of Commissioners)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 10/3/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDEP coastal permit (joint_coastal_permit) — joint_coastal_permit. Coastal armor / sand / fill projects typically move 10K-1M+ cy. | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_COASTAL_ENV
    Captured FDEP_COASTAL_ENV_0269516-003-JN from fdep_coastal_env

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
FRANKLIN COUNTY CENTRAL LANDFILL · Eastpoint
One-way
28.8 mi
Round trip
57.6 mi
Closest import source (quarry)
CYD Cabbage Grove · Daytona Beach
One-way
29.8 mi
Round trip
59.6 mi
TypeNameCityOne-wayRT mi
quarryCYD Cabbage GroveDaytona Beach29.8 mi59.6
quarryPerry QuarryFort Myers30.3 mi60.6
sand pitSilver Lake 1Tallahassee36.3 mi72.5
sand pitA-Mining Group II LLC.Quincy43.2 mi86.4
quarryActive Minerals Attapulgite DivisionQuincy48.5 mi96.9
transfer stationFRANKLIN COUNTY CENTRAL LANDFILLEastpoint28.8 mi57.6
landfillMARPAN SUPPLY COMPANY INCTallahassee32.7 mi65.4
landfillCROWDER RECYCLING TRAMTallahassee34.1 mi68.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_coastal_envFDEP_COASTAL_ENV_0269516-003-JN2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/5c3a261f