Leads/5ba3671a
Approved · unknownPINELLAS County

USACE 404 — 9380 67TH STREET, PINELLAS PARK

9380 67TH ST, PINELLAS PARK, FL, 33782

Load estimate pending
Lifecycle
Permitted as of May 16, 2013
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 9380 67TH STREET, PINELLAS PARK

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base public_works/earthwork (65) | stage=permit_issued, but stale (13y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0228278-002-EM from fdep_spgp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (transfer station)
CLEARWATER MATERIALS TRANSFER FACILITY · Clearwater
One-way
2.3 mi
Round trip
4.6 mi · ~25 min
Rate / load
$85–$110
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
18.4 mi
Round trip
36.8 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryTampa Cement Grinding PlantTampa18.4 mi36.8~75m$175–$230
quarryCaloosa MaterialsRuskin20.8 mi41.5~75m$175–$230
quarryCentral State Aggregates LLCZephyrhill35.7 mi71.5~100m$230–$290
quarryGeorgia Stone Spring Hill QuarryAtlanta 39.3 mi78.7~100m$230–$290
sand pitCounty Line MineSpring Hill40.9 mi81.7~130m$290–$370
quarryWingate Creek MineLithia44.7 mi89.4~130m$290–$370
quarryFour CornersLithia46.9 mi93.8~130m$290–$370
transfer stationCLEARWATER MATERIALS TRANSFER FACILITYClearwater2.3 mi4.6~25m$85–$110
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0228278-002-EM2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
PINELLAS
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/5ba3671a