Approved · unknown
Ready Mix Concrete Plant — TARMAC FLORIDA (RIVIERA BEACH)
DYER BLVD & MILITARY TR, RIVIERA BEACH, FL
Load estimate pending
Lifecycle
Completed as of Dec 13, 1993
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
Ready Mix Concrete Plant — TARMAC FLORIDA (RIVIERA BEACH)
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: Base unknown/other (20)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_ARMS_FACILITIESCaptured FDEP_ARMS_0990190 from fdep_arms_facilities
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (landfill)
WM RECYCLING RIVIERA BEACH · West Palm Beach
One-way
0.2 mi
Round trip
0.4 mi
Closest import source (quarry)
Palm Beach Aggregates LLC · Jacksonville
One-way
16.7 mi
Round trip
33.3 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Palm Beach Aggregates LLC | Jacksonville | 16.7 mi | 33.3 |
| sand pit | Palm City Mine | Greenacres | 24.1 mi | 48.2 |
| sand pit | MC320 Mine | Palm City | 25.3 mi | 50.7 |
| quarry | 1412 Canal Point | Hammond | 32.1 mi | 64.2 |
| quarry | Five Stones Mine, LLC. | Tinton Falls | 33.2 mi | 66.3 |
| quarry | Star Quarries | SOUTH BAY | 39.3 mi | 78.5 |
| quarry | Fort Pierce Mine | Jacksonville | 41.7 mi | 83.4 |
| landfill | WM RECYCLING RIVIERA BEACH | West Palm Beach | 0.2 mi | 0.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_arms_facilities | FDEP_ARMS_0990190 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/59432558