Leads/5857ee26
Approved · unknownCitrus County

FDOT — SR 44/E GULF TO LAKE HWY FROM E OF US 41 TO SUMTER COUNTY LI NE - RESURFACING

Citrus County — FDOT Contract T7531

Load estimate pending
Lifecycle
Completed as of Nov 14, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

FDOT — SR 44/E GULF TO LAKE HWY FROM E OF US 41 TO SUMTER COUNTY LI NE - RESURFACING

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$18.0M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — SR 44/E GULF TO LAKE HWY FROM E OF US 41 TO SUMTER COUNTY LI NE - RESURFACING. Vendor: C.W. ROBERTS CONTRACTING, INC.. Cost: $18,023,172. | FDOT public project (+15) | size signal: $18,023,172 valuation (+20) | FDOT public project (+15) | size signal: $18,023,172 valuation (+20) | FDOT public project (+15) | size signal: $18,023,172 valuation (+20) | FDOT public project (+15) | size signal: $18,023,172 valuation (+20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_T7531_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Manko Co Sec 5 Mine/Phos · Ocala
One-way
9.5 mi
Round trip
19 mi
TypeNameCityOne-wayRT mi
quarryManko Co Sec 5 Mine/PhosOcala9.5 mi19
quarryLecanto MineCrystal River11.4 mi22.9
quarryMaylen MineCrystal River12.4 mi24.8
quarryCenter Hill MineBrooksville13.3 mi26.6
quarrySUMTERVILLE QUARRYOcala15.0 mi30
quarrySt Catherine MineBrooksville15.8 mi31.6
quarryCalcium PlantJacksonville15.9 mi31.8
quarrySUMTERVILLE MINEOcala16.5 mi33
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Citrus County Permits
Inverness / Crystal River Building
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_T7531_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Citrus
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/5857ee26