Leads/578dd7ea
Approved · application_filedPinellas County

Whispering Pines - Drainage Improvements

SWFWMD ERP — site address pending

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

Whispering Pines - Drainage Improvements

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
MHC Whispering Pines Largo, L.L.C.
Why this is a hauling opportunity: Base unknown/other (20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_928798 from swfwmd_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
GREEN ENERGY TRANSPORT TRANSFER STATION (FKA WALKER HAULING) · Clearwater
One-way
1.1 mi
Round trip
2.3 mi
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
18.4 mi
Round trip
36.7 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa18.4 mi36.7
quarryCaloosa MaterialsRuskin23.2 mi46.3
quarryCentral State Aggregates LLCZephyrhill34.1 mi68.2
quarryGeorgia Stone Spring Hill QuarryAtlanta 36.5 mi73
sand pitCounty Line MineSpring Hill37.8 mi75.6
quarryWingate Creek MineLithia47.1 mi94.3
quarryFour CornersLithia48.1 mi96.2
transfer stationGREEN ENERGY TRANSPORT TRANSFER STATION (FKA WALKER HAULING)Clearwater1.1 mi2.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
MHC Whispering Pines Largo, L.L.C.

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9287982026-05-17Open ↗

Parcel Detail

Property records and ownership

Property
County
Pinellas
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/578dd7ea