Leads/54806fc3
Approved · unknownMANATEE County

USACE 404 — DELMONTE

2415 LANDINGS CIR, BRADENTON, FL, 34209

Load estimate pending
Lifecycle
Permitted as of Apr 7, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — DELMONTE

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 4/7/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base public_works/earthwork (65) | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0470070-001-EG from fdep_spgp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
9.1 mi
Round trip
18.1 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
17.7 mi
Round trip
35.3 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin17.7 mi35.3
quarryTampa Cement Grinding PlantTampa31.0 mi62.1
quarryWingate Creek MineLithia32.1 mi64.2
quarrySouth Pasture MineLithia43.6 mi87.2
quarryFlorida Shell & Fill Company LLCNaples44.0 mi88.1
quarryFour CornersLithia44.5 mi89.1
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton9.1 mi18.1
landfillRECOMMUNITY HOLDINGS LP (FKA RRS/FCR)Sarasota12.4 mi24.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Manatee County Permits
Bradenton / Palmetto Building & Dev Services
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0470070-001-EG2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
MANATEE
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/54806fc3