Approved · unknownMonroe County
FDOT — SR5/US1 OVERSEAS HWY SEVEN MILE BRIDGE OVER MOSER CHANNEL- B R# 900101 - BRIDGE-REPAIR/REHABILITATION
Monroe County — FDOT Contract E6P31
Load estimate pending
Lifecycle
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
FDOT — SR5/US1 OVERSEAS HWY SEVEN MILE BRIDGE OVER MOSER CHANNEL- B R# 900101 - BRIDGE-REPAIR/REHABILITATION
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$17.7M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR5/US1 OVERSEAS HWY SEVEN MILE BRIDGE OVER MOSER CHANNEL- B R# 900101 - BRIDGE-. Vendor: FREYSSINET, INC.. Cost: $17,733,651. | FDOT public project (+15) | size signal: $17,733,651 valuation (+20) | FDOT public project (+15) | size signal: $17,733,651 valuation (+20) | FDOT public project (+15) | size signal: $17,733,651 valuation (+20) | FDOT public project (+15) | size signal: $17,733,651 valuation (+20) | FDOT public project (+15) | size signal: $17,733,651 valuation (+20)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E6P31_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (transfer station)
MARATHON TRANSFER STATION · Marathon
One-way
8.4 mi
Round trip
16.7 mi
Closest import source (quarry)
Windley Quarry
One-way
40.0 mi
Round trip
79.9 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| transfer station | MARATHON TRANSFER STATION | Marathon | 8.4 mi | 16.7 |
| landfill | CUDJOE KEY LANDFILL | Cudjoe Key | 21.3 mi | 42.7 |
| transfer station | LONG KEY TRANSFER STATION | Long Key | 23.5 mi | 47 |
| transfer station | NEW ROCKLAND RECYCLING CENTER | Key West | 32.8 mi | 65.5 |
| transfer station | CITY OF KEY WEST SOLID WASTE TRANSFER STATION | Key West | 32.8 mi | 65.7 |
| transfer station | KEY WEST TRANSFER STATION AND HAULING SERVICE INC | Key West | 36.6 mi | 73.2 |
| landfill | Mount Trashmore | — | 37.3 mi | 74.6 |
| quarry | Windley Quarry | — | 40.0 mi | 79.9 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E6P31_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Monroe
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/530c8b82