Approved · unknown
Ready Mix Concrete Plant — EAST PLANT
EAST PLANT 9TH ST E, BRADENTON, FL, 34208
Load estimate pending
Lifecycle
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
Ready Mix Concrete Plant — EAST PLANT
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: Ready Mix Concrete Plant INACTIVE (shutdown unknown). | individual owner, residential scale — capped low | individual owner, residential scale — capped low | individual owner, residential scale — capped low | individual owner, residential scale — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_ARMS_FACILITIESCaptured FDEP_ARMS_0810037 from fdep_arms_facilities
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
3.5 mi
Round trip
7 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
16.8 mi
Round trip
33.6 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 16.8 mi | 33.6 |
| quarry | Wingate Creek Mine | Lithia | 26.4 mi | 52.8 |
| quarry | Tampa Cement Grinding Plant | Tampa | 32.1 mi | 64.2 |
| quarry | South Pasture Mine | Lithia | 38.8 mi | 77.6 |
| quarry | Florida Shell & Fill Company LLC | Naples | 39.2 mi | 78.4 |
| quarry | Four Corners | Lithia | 40.7 mi | 81.3 |
| quarry | 4M-31 Mine | Alva | 46.5 mi | 92.9 |
| landfill | 63RD AVENUE EAST WASTE PROCESSING FACILITY | Bradenton | 3.5 mi | 7 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_arms_facilities | FDEP_ARMS_0810037 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/51e5abe4