Leads/507262b5
Approved · unknownPASCO County

USACE 404 — 5525 BAMBOO LN [DOCK]

5525 BAMBOO LN, NEW PORT RICHEY, FL, 34652

~120loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Feb 15, 2018
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 5525 BAMBOO LN [DOCK]

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
0.48 ac
Parcel 32-25-16-033A-00200-0010
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
LEE DAVID J & JEANETTE M
Why this is a hauling opportunity: Base public_works/earthwork (65) | size signal: ~120 est. loads (+12) | stage=permit_issued, but stale (8y old) | homeowner-scale dock/seawall — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0342746-003-EE from fdep_spgp
  2. 2026-06-03PASCOPA
    Captured PASCOPA_32-25-16-033A-00200-0010_507262b5 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
15.0 mi
Round trip
30 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitCounty Line MineSpring Hill15.0 mi30~75m$175–$230
quarryGeorgia Stone Spring Hill QuarryAtlanta 16.6 mi33.2~75m$175–$230
quarryCentral State Aggregates LLCZephyrhill26.3 mi52.7~100m$230–$290
quarryBrooksville QuarryBrooksville28.0 mi55.9~100m$230–$290
quarryTampa Cement Grinding PlantTampa28.3 mi56.6~100m$230–$290
quarryBrooksville South Cement PlantBrooksville28.8 mi57.6~100m$230–$290
quarryCalcium PlantJacksonville31.4 mi62.9~100m$230–$290
quarryCenter Hill MineBrooksville35.4 mi70.7~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
LEE DAVID J & JEANETTE M

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0342746-003-EE2026-05-28Open ↗
pascopaPASCOPA_32-25-16-033A-00200-0010_507262b52026-06-03Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
32-25-16-033A-00200-0010
Strap
32-25-16-033A-00200-0010
Address
5525 BAMBOO LANE, NEW PORT RICHEY
Zip
34652
Acreage
0.48 ac
Sq ft
20,909
Use
Improved
Owner of record
LEE DAVID J & JEANETTE M
Last sale
2016-02-10
$600,000
Appraiser valuation
Just (market)
$878,484

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/507262b5