Leads/4ea2d25e
Approved · unknown

Ready Mix Concrete Plant — PENSACOLA RM USA-MAIN SITE PLANTS #1&2

3008 S Highway 95A, CANTONMENT, FL, 32533

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

Ready Mix Concrete Plant — PENSACOLA RM USA-MAIN SITE PLANTS #1&2

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Operating ready mix concrete plant — supplier/customer location for haulers. | unknown type, no size signal — capped <40

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_ARMS_FACILITIES
    Captured FDEP_ARMS_0330071 from fdep_arms_facilities

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
SURREY PIT (PANHANDLE GRADING & PAVING 8 MILE) · Pensacola
One-way
2.9 mi
Round trip
5.7 mi
Closest import source (sand pit)
Devine Pit · CANTONMENT
One-way
3.8 mi
Round trip
7.5 mi
TypeNameCityOne-wayRT mi
sand pitDevine PitCANTONMENT3.8 mi7.5
sand pitMolino PitCantonment14.1 mi28.1
sand pitQuikrete MineMILTON15.3 mi30.5
sand pitShortleaf Borrow PitCANTONMENT23.0 mi46
sand pitRiver Road PitNavarre27.2 mi54.3
sand pitG2C Sand MineNiceville46.9 mi93.9
landfillSURREY PIT (PANHANDLE GRADING & PAVING 8 MILE)Pensacola2.9 mi5.7
landfillLONGLEAF C&D DISPOSAL FACILITYPensacola4.8 mi9.5
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_arms_facilitiesFDEP_ARMS_03300712026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/4ea2d25e