Leads/4d9ea189
Approved · unknownPINELLAS County

USACE 404 — 119 HARBOR DRIVE, PALM HARBOR

119 HARBOR DRIVE, PALM HARBOR, FL, 34683

~52loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Feb 23, 2016
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 119 HARBOR DRIVE, PALM HARBOR

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 2/23/2016 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
0.2088 ac
Parcel 224750
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
BILD, DAVID H REV TRUST
Why this is a hauling opportunity: Base public_works/earthwork (65) | stage=permit_issued, but stale (10y old) | homeowner-scale dock/seawall — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0341858-001-EE from fdep_spgp
  2. 2026-07-06PCPAO
    Captured PCPAO_224750_4d9ea189 from pcpao

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
22.7 mi
Round trip
45.4 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa22.7 mi45.4
quarryGeorgia Stone Spring Hill QuarryAtlanta 28.6 mi57.2
sand pitCounty Line MineSpring Hill28.6 mi57.2
quarryCentral State Aggregates LLCZephyrhill31.3 mi62.7
quarryCaloosa MaterialsRuskin32.7 mi65.4
quarryBrooksville QuarryBrooksville41.4 mi82.9
quarryBrooksville South Cement PlantBrooksville42.2 mi84.3
quarryCalcium PlantJacksonville45.0 mi90.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
BILD, DAVID H REV TRUST

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0341858-001-EE2026-05-28Open ↗
pcpaoPCPAO_224750_4d9ea1892026-07-06Open ↗

Parcel Detail

Pinellas County Property Appraiser

PropertyPCPAO
Folio
224750
Strap
10-28-15-65124-000-0100
Address
119 Harbor Dr
Zip
34683
Acreage
0.2088 ac
Sq ft
9,095
Year built
2021
Use
0110 Single Family ...
Subdivision
OZONA SHORES 4TH ADD
Owner of record
BILD, DAVID H REV TRUST
BILD, DAVID H TRE
Last sale
2014-02-01
$445,000
Appraiser valuation
Just (market)
$2,405,428
Assessed
$1,487,128
Taxable
$1,436,406

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/4d9ea189