Leads/4a265eb7
Approved · planning

CAPTN JACKS OVERFLOW PARKING

1197 N PINELLAS AVE, TARPON SPRINGS, FL, 34689

Load estimate pending
Lifecycle
Permitted as of Aug 5, 2022
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CAPTN JACKS OVERFLOW PARKING

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
RAYMOND BELLAS
Why this is a hauling opportunity: Base unknown/other (20) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0424709-001-EG from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
22.1 mi
Round trip
44.2 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitCounty Line MineSpring Hill22.1 mi44.2~75m$175–$230
quarryGeorgia Stone Spring Hill QuarryAtlanta 22.7 mi45.3~75m$175–$230
quarryTampa Cement Grinding PlantTampa24.7 mi49.3~75m$175–$230
quarryCentral State Aggregates LLCZephyrhill28.4 mi56.7~100m$230–$290
quarryBrooksville QuarryBrooksville35.0 mi70.1~100m$230–$290
quarryBrooksville South Cement PlantBrooksville35.8 mi71.6~100m$230–$290
quarryCaloosa MaterialsRuskin37.0 mi74~100m$230–$290
quarryCalcium PlantJacksonville38.6 mi77.2~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
RAYMOND BELLAS

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0424709-001-EG2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/4a265eb7