Approved · unknown
Ready Mix Concrete Plant — NORTH FLORIDA CONCRETE INACTIVE
N OF US 19, E OF CROSS CITY, CROSS CITY, FL, 32628
Load estimate pending
Lifecycle
Completed as of Jan 2, 1990
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
Ready Mix Concrete Plant — NORTH FLORIDA CONCRETE INACTIVE
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: Base unknown/other (20) | individual owner, residential scale — capped low | individual owner, residential scale — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_ARMS_FACILITIESCaptured FDEP_ARMS_0290009 from fdep_arms_facilities
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Dixie County Pit · Cross City
One-way
10.7 mi
Round trip
21.5 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Dixie County Pit | Cross City | 10.7 mi | 21.5 |
| quarry | TOWNSEND PIT | Bell | 22.7 mi | 45.3 |
| quarry | SUWANNEE COUNTY PUBLIC WORKS | LIVE OAK | 28.6 mi | 57.2 |
| quarry | Suwannee American Cement | Branford | 29.7 mi | 59.5 |
| quarry | SUWANNEE AMERICAN CEMENT | Branford | 29.7 mi | 59.5 |
| quarry | Beachville Mine | Live Oak | 30.7 mi | 61.3 |
| quarry | Blue Rok Incorporated | perry | 30.7 mi | 61.4 |
| quarry | Levy County Pit | Bronson | 31.5 mi | 62.9 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_arms_facilities | FDEP_ARMS_0290009 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/4724ba06