Leads/444cfa55
Approved · unknown

Beach Erosion — beach_erosion (The Breakers Hotel)

PB-093

Load estimate pending
Lifecycle
Permitted as of Nov 18, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Beach Erosion — beach_erosion (The Breakers Hotel)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 11/18/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDEP coastal permit (beach_erosion) — beach_erosion. Coastal armor / sand / fill projects typically move 10K-1M+ cy. | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_COASTAL_ENV
    Captured FDEP_COASTAL_ENV_0414369-004-BE from fdep_coastal_env

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
TOWN OF PALM BEACH -- PINEWALK TRANSFER STATION · Palm Beach
One-way
0.5 mi
Round trip
0.9 mi
Closest import source (quarry)
Palm Beach Aggregates LLC · Jacksonville
One-way
20.7 mi
Round trip
41.3 mi
TypeNameCityOne-wayRT mi
quarryPalm Beach Aggregates LLCJacksonville20.7 mi41.3
sand pitPalm City MineGreenacres30.2 mi60.4
sand pitMC320 MinePalm City31.6 mi63.2
quarry1412 Canal PointHammond38.4 mi76.8
quarryFive Stones Mine, LLC.Tinton Falls39.1 mi78.2
quarryStar QuarriesSOUTH BAY43.4 mi86.7
quarryFort Pierce MineJacksonville47.8 mi95.7
transfer stationTOWN OF PALM BEACH -- PINEWALK TRANSFER STATIONPalm Beach0.5 mi0.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_coastal_envFDEP_COASTAL_ENV_0414369-004-BE2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/444cfa55