Leads/3ffe23ed
Approved · unknownHILLSBOROUGH County

State 404 — BIG BEND BLENDING STATION

5621 PEMBROKE RD, GIBSONTON, FL, 33534

Load estimate pending
Lifecycle
Permitted as of Feb 7, 2023
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

State 404 — BIG BEND BLENDING STATION

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_STATE404
    Captured FDEP_ST404_0410891-004-SFM from fdep_state404

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
7.4 mi
Round trip
14.8 mi · ~40 min
Rate / load
$110–$140
TypeNameCityOne-wayRT mi~CycleRate / load
quarryCaloosa MaterialsRuskin7.4 mi14.8~40m$110–$140
quarryTampa Cement Grinding PlantTampa9.8 mi19.6~40m$110–$140
quarryFour CornersLithia25.9 mi51.7~100m$230–$290
quarryWingate Creek MineLithia26.6 mi53.1~100m$230–$290
quarryCentral State Aggregates LLCZephyrhill28.4 mi56.9~100m$230–$290
quarrySouth Pasture MineLithia29.2 mi58.4~100m$230–$290
quarrySouth Fort Meade MineLithia40.3 mi80.7~130m$290–$370
quarryGeorgia Stone Spring Hill QuarryAtlanta 40.8 mi81.7~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
fdep_state404FDEP_ST404_0410891-004-SFM2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
HILLSBOROUGH
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/3ffe23ed