Approved · unknownIndian River County
FDOT — SR-5/US-1 FROM 45TH STREET TO SOUTH OF 53RD STREET - SIDEWAL K
Indian River County — FDOT Contract E4W98
Load estimate pending
Lifecycle
Completed as of May 29, 2025
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — SR-5/US-1 FROM 45TH STREET TO SOUTH OF 53RD STREET - SIDEWAL K
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$15K
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR-5/US-1 FROM 45TH STREET TO SOUTH OF 53RD STREET - SIDEWAL K. Vendor: ALEXANDER DESIGN + BUILD, LLC. Cost: $15,042. | FDOT public project (+15) | FDOT public project (+15) | FDOT public project (+15)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E4W98_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (sand pit)
Blue Goose Mine · Fort Pierce
One-way
5.5 mi
Round trip
11 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Blue Goose Mine | Fort Pierce | 5.5 mi | 11 |
| sand pit | Vero Rock and Sand | Vero Beach | 5.8 mi | 11.6 |
| quarry | Capron Trails Mine | Jupiter | 11.4 mi | 22.8 |
| sand pit | Sunshine Mine | Fort Pierce | 16.3 mi | 32.7 |
| quarry | Brisbane Pit | Fellsmere | 17.6 mi | 35.1 |
| quarry | Fort Pierce Mine | Jacksonville | 28.6 mi | 57.2 |
| quarry | Buck Hammock | Orlando | 41.1 mi | 82.2 |
| quarry | 1412 Canal Point | Hammond | 41.3 mi | 82.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E4W98_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Indian River
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/3be4ed9f