Approved · unknownOrange County
FDOT — SR 408 EB TO I-4 EB LOOP RAMP - SAFETY PROJECT
Orange County — FDOT Contract E59F2
Load estimate pending
Lifecycle
Active as of Jan 25, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
FDOT — SR 408 EB TO I-4 EB LOOP RAMP - SAFETY PROJECT
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$1.2M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR 408 EB TO I-4 EB LOOP RAMP - SAFETY PROJECT. Vendor: ATLANTIC CIVIL CONSTRUCTORS CORP. Cost: $1,236,337. | FDOT public project (+15) | size signal: $1,236,337 valuation (+12) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $1,236,337 valuation (+12) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $1,236,337 valuation (+12) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $1,236,337 valuation (+12) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E59F2_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (sand pit)
Center Sand Company · Clermont
One-way
18.6 mi
Round trip
37.1 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Center Sand Company | Clermont | 18.6 mi | 37.1 |
| sand pit | Independent Mine | Davenport | 19.3 mi | 38.6 |
| sand pit | Four Corners Sand Mine | Brooksville | 19.3 mi | 38.7 |
| sand pit | Hilochee Sand Mine | Davenport | 22.3 mi | 44.5 |
| quarry | S & L Materials Inc | KISSIMMEE | 22.5 mi | 45 |
| sand pit | Cypress Sand | Lexington | 23.3 mi | 46.6 |
| quarry | Beeline Mine | Orlando | 23.6 mi | 47.3 |
| sand pit | Lake Sand Plant | Jacksonville | 23.7 mi | 47.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E59F2_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Orange
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/3bb55798