Leads/39ba040f
Approved · planningManatee County

SULLIVAN CANOPY

3615 4TH AVE NE, BRADENTON, FL, 34208

Load estimate pending
Lifecycle
Permitted as of Jul 17, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

SULLIVAN CANOPY

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 7/17/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$1.1M
Actual — from source record
Acreage
Parcel 1098300159
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
SHAWN SULLIVAN
Why this is a hauling opportunity: Base unknown/other (20) | size signal: $1,140,004 valuation (+12) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0461693-001-EG from fdep_erp
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_1098300159_39ba040f from fl_dor_cadastral

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
14.4 mi
Round trip
28.7 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin14.4 mi28.7
quarryWingate Creek MineLithia24.1 mi48.3
quarryTampa Cement Grinding PlantTampa30.0 mi60
quarrySouth Pasture MineLithia36.2 mi72.4
quarryFour CornersLithia37.9 mi75.7
quarryFlorida Shell & Fill Company LLCNaples40.2 mi80.4
quarry4M-31 MineAlva45.2 mi90.4
quarrySouth Fort Meade MineLithia47.7 mi95.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
SHAWN SULLIVAN

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - ERP Noticed General Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

Official source-of-truth portal
Manatee County Permits
Bradenton / Palmetto Building & Dev Services
ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0461693-001-EG2026-05-24Open ↗
fl_dor_cadastralFDOR_1098300159_39ba040f2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
1098300159
County
Manatee
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/39ba040f