Leads/3849be12
Approved · unknown

Coastal Env — coastal_env (Stantec)

ST-033

Load estimate pending
Lifecycle
Permitted as of Aug 26, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Coastal Env — coastal_env (Stantec)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 8/26/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDEP coastal permit (coastal_env) — coastal_env. Coastal armor / sand / fill projects typically move 10K-1M+ cy. | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_COASTAL_ENV
    Captured FDEP_COASTAL_ENV_0079193-004-BN from fdep_coastal_env

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
28.2 mi
Round trip
56.5 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin28.2 mi56.5
quarryFlorida Shell & Fill Company LLCNaples29.1 mi58.2
quarryWingate Creek MineLithia30.7 mi61.3
quarryTampa Cement Grinding PlantTampa43.8 mi87.7
quarry4M-31 MineAlva44.6 mi89.1
quarrySouth Pasture MineLithia44.9 mi89.9
sand pitWashington Loop MinePunta Gorda45.4 mi90.8
quarryBermont Materials AlicoPunta Gorda47.1 mi94.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_coastal_envFDEP_COASTAL_ENV_0079193-004-BN2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)