Leads/371eb08f
Approved · unknown

Coastal Env — coastal_env (Bay County)

Shell Island

Load estimate pending
Lifecycle
Filed as of Feb 20, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

Coastal Env — coastal_env (Bay County)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 2/20/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDEP coastal permit (coastal_env) — coastal_env. Coastal armor / sand / fill projects typically move 10K-1M+ cy. | government/public-authority project (floor 55) | government/public-authority project (floor 55) | government/public-authority project (floor 55) | government/public-authority project (floor 55) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_COASTAL_ENV
    Captured FDEP_COASTAL_ENV_0164900-003-JC from fdep_coastal_env

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
COASTAL PARASAIL, INC. RECYCLING FACILITY (PREV BAY CO) · Panama City Beach
One-way
16.3 mi
Round trip
32.6 mi
Closest import source (sand pit)
Sandhills Plant 2 · Dothan
One-way
26.7 mi
Round trip
53.4 mi
TypeNameCityOne-wayRT mi
sand pitSandhills Plant 2Dothan26.7 mi53.4
sand pitPanama City QuarryMurfresboro37.6 mi75.3
quarry1874 MariannaHammond48.3 mi96.6
quarryROCKY CREEK MINE AND MILLMarianna48.7 mi97.4
transfer stationCOASTAL PARASAIL, INC. RECYCLING FACILITY (PREV BAY CO)Panama City Beach16.3 mi32.6
landfillTRASH ROLLOFF OF BAY COUNTY INC. PITYoungstown18.4 mi36.9
landfillLYNN HAVEN C&D DISPOSAL FACILITYPanama City19.6 mi39.3
landfillSOUTHPORT C&D DISPOSAL FACILITYSouthport22.0 mi44
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_coastal_envFDEP_COASTAL_ENV_0164900-003-JC2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/371eb08f