Approved · planning
MANATEE COUNTY OYSTER
SEE DIRECTIONS, BRADENTON, FL, 34208
Load estimate pending
Lifecycle
Permitted as of Apr 9, 2026
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
MANATEE COUNTY OYSTER
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Manatee County Board of County Commissioners
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | unknown type, no size signal — capped <40
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-24FDEP_ERPCaptured FDEP_ERP_0408792-003-EI from fdep_erp
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
14.9 mi
Round trip
29.8 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 14.9 mi | 29.8 |
| quarry | Wingate Creek Mine | Lithia | 24.6 mi | 49.1 |
| quarry | Tampa Cement Grinding Plant | Tampa | 30.5 mi | 61 |
| quarry | South Pasture Mine | Lithia | 36.7 mi | 73.4 |
| quarry | Four Corners | Lithia | 38.5 mi | 76.9 |
| quarry | Florida Shell & Fill Company LLC | Naples | 39.9 mi | 79.8 |
| quarry | 4M-31 Mine | Alva | 45.4 mi | 90.8 |
| quarry | South Fort Meade Mine | Lithia | 48.2 mi | 96.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Developer
Manatee County Board of County Commissioners
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_erp | FDEP_ERP_0408792-003-EI | 2026-05-24 | Open ↗ |
Parcel Detail
Property records and ownership
Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/356a94a6