Approved · unknown
Ready Mix Concrete Plant — MARSHALL STREET READY-MIX PLANT
1751 MARSHALL ST, JACKSONVILLE, FL, 32206
Load estimate pending
Lifecycle
Completed as of Apr 13, 2011
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
Ready Mix Concrete Plant — MARSHALL STREET READY-MIX PLANT
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: Base unknown/other (20)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_ARMS_FACILITIESCaptured FDEP_ARMS_0310192 from fdep_arms_facilities
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (transfer station)
WATER RECOVERY, LLC · Jacksonville
One-way
0.4 mi
Round trip
0.7 mi
Closest import source (quarry)
Dames Point Terminal · Brooksville
One-way
5.9 mi
Round trip
11.7 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Dames Point Terminal | Brooksville | 5.9 mi | 11.7 |
| quarry | The Chemours Company FC LLC | Starke | 37.7 mi | 75.4 |
| sand pit | Goldhead Sand Plant | Jacksonville | 40.2 mi | 80.4 |
| quarry | SRM Materials East Palatka | Murfresboro | 45.0 mi | 90 |
| sand pit | Grandin Sand Plant | Jacksonville | 45.1 mi | 90.2 |
| transfer station | WATER RECOVERY, LLC | Jacksonville | 0.4 mi | 0.7 |
| transfer station | REALCO RECYCLING CO., INC. MRF | Jacksonville | 4.9 mi | 9.8 |
| transfer station | COASTAL RECYCLING SERVICES | Jacksonville | 7.6 mi | 15.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_arms_facilities | FDEP_ARMS_0310192 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/31d584b0