Leads/318f5ec4
Approved · unknownCollier County

FDOT — SR 90 (US 41) FROM N OF THOMASSON DR TO S OF SOUTHWEST BLVD - PAVEMENT ONLY RESURFACE (FLEX)

Collier County — FDOT Contract E1W92

Load estimate pending
Lifecycle
Completed as of May 27, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

FDOT — SR 90 (US 41) FROM N OF THOMASSON DR TO S OF SOUTHWEST BLVD - PAVEMENT ONLY RESURFACE (FLEX)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$6.4M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — SR 90 (US 41) FROM N OF THOMASSON DR TO S OF SOUTHWEST BLVD - PAVEMENT ONLY RESU. Vendor: PREFERRED MATERIALS INC.. Cost: $6,394,150. | FDOT public project (+15) | size signal: $6,394,150 valuation (+20) | FDOT public project (+15) | size signal: $6,394,150 valuation (+20) | FDOT public project (+15) | size signal: $6,394,150 valuation (+20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_E1W92_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Golden Gate Quarry · Daytona Beach, FL
One-way
11.4 mi
Round trip
22.8 mi
TypeNameCityOne-wayRT mi
quarryGolden Gate QuarryDaytona Beach, FL11.4 mi22.8
sand pit846 Mine LLCNaples16.2 mi32.3
sand pitCorkscrewEstero26.9 mi53.8
quarryFort Myers QuarryFort Myers27.3 mi54.7
quarryFort Myers MineJacksonville28.4 mi56.8
quarryALICO ROAD QUARRYMiami28.7 mi57.3
quarrySunniland MineNaples29.9 mi59.7
quarryBell MineFort Myers31.9 mi63.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Collier County Permits
Naples / Marco Island Growth Management
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_E1W92_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Collier
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/318f5ec4