Approved · unknownMARION County
Cleanup (petroleum cleanup) — CENTRAL BAPTIST CHURCH
1714 SE 36TH AVE, OCALA, FL, 32671
Load estimate pending
Lifecycle
Active as of May 28, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — CENTRAL BAPTIST CHURCH
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Parcel 29509-000-13
Est truck loads
—
Needs site plan parse
Sources seen
10
Public records referencing this job
Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87797492 from fdep_cleanup_sites
- 2026-06-01MARIONPACaptured MARIONPA_29509-000-13_30abfe47 from marionpa
- 2026-06-13FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87950819 from fdep_cleanup_sites
- 2026-06-13MARIONPACaptured MARIONPA_29509-000-13_55c74370 from marionpa
- 2026-06-16FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87981469 from fdep_cleanup_sites
- 2026-06-19MARIONPACaptured MARIONPA_29509-000-13_70cb6e0a from marionpa
- 2026-06-23FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88052917 from fdep_cleanup_sites
- 2026-06-24MARIONPACaptured MARIONPA_29509-000-13_ca78f679 from marionpa
- 2026-06-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88103914 from fdep_cleanup_sites
- 2026-06-28MARIONPACaptured MARIONPA_29509-000-13_8bf938ed from marionpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
NORTH MINE · OCALA
One-way
2.9 mi
Round trip
5.7 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | NORTH MINE | OCALA | 2.9 mi | 5.7 |
| quarry | Stavola NW Pit | Ocala | 8.1 mi | 16.1 |
| sand pit | Lynne Mine | Davenport | 11.6 mi | 23.1 |
| quarry | Lowell Mine & Mill | Ocala | 12.2 mi | 24.3 |
| quarry | Reddick Mine | Pompano Beach | 14.8 mi | 29.5 |
| quarry | 328 Pit | Ocala | 16.9 mi | 33.7 |
| quarry | Ocala Quarry | Atlanta | 17.3 mi | 34.7 |
| sand pit | Weirsdale Sand Plant | Jacksonville | 19.0 mi | 38 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87797492 | 2026-05-28 | Open ↗ |
| marionpa | MARIONPA_29509-000-13_30abfe47 | 2026-06-01 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87950819 | 2026-06-13 | Open ↗ |
| marionpa | MARIONPA_29509-000-13_55c74370 | 2026-06-13 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87981469 | 2026-06-16 | Open ↗ |
| marionpa | MARIONPA_29509-000-13_70cb6e0a | 2026-06-19 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88052917 | 2026-06-23 | Open ↗ |
| marionpa | MARIONPA_29509-000-13_ca78f679 | 2026-06-24 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88103914 | 2026-06-28 | Open ↗ |
| marionpa | MARIONPA_29509-000-13_8bf938ed | 2026-06-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- Parcel ID
- 29509-000-13
- County
- MARION
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/30abfe47