Leads/2e7658f8
Approved · unknown

Limestone Quarry — DSD KEESTRACK R5

2898 Harry T Moore Ave, MIMS, FL, 32754

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

Limestone Quarry — DSD KEESTRACK R5

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Operating limestone quarry — supplier/customer location for haulers. | unknown type, no size signal — capped <40

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_ARMS_FACILITIES
    Captured FDEP_ARMS_7776317 from fdep_arms_facilities

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
TITUSVILLE TRANSFER STATION · Titusville
One-way
7.7 mi
Round trip
15.4 mi
Closest import source (quarry)
Rock Solid Rock, LLC · Titusville
One-way
14.4 mi
Round trip
28.8 mi
TypeNameCityOne-wayRT mi
quarryRock Solid Rock, LLCTitusville14.4 mi28.8
quarryBeeline MineOrlando15.0 mi30.1
quarryS & L Materials IncKISSIMMEE18.2 mi36.5
quarryBuck HammockOrlando 40.4 mi80.9
transfer stationTITUSVILLE TRANSFER STATIONTitusville7.7 mi15.4
landfillKSC SCHWARTZ ROAD LANDFILL CLASS IIIOrlando15.1 mi30.3
transfer stationOSCEOLA RD SOLID WASTE MGMT FACILITY-CLASS I LANDFILLGeneva17.0 mi34
landfillBREVARD CENTRAL LANDFILLCocoa19.1 mi38.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_arms_facilitiesFDEP_ARMS_77763172026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/2e7658f8