Leads/27948f74
Approved · unknownHILLSBOROUGH County

Cleanup (petroleum cleanup) — TIRES PLUZ

1301 W WATERS AVE, TAMPA, FL, 33604

~10loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of Jun 9, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

Cleanup (petroleum cleanup) — TIRES PLUZ

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.04 ac
Parcel 0988180000
Est truck loads
Needs site plan parse
Sources seen
12
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
NEWSTAR ACQUISITION LLC
Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_87799741 from fdep_cleanup_sites
  2. 2026-06-04FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_87861093 from fdep_cleanup_sites
  3. 2026-06-10FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_87922414 from fdep_cleanup_sites
  4. 2026-06-11FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_87942851 from fdep_cleanup_sites
  5. 2026-06-15FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_87983716 from fdep_cleanup_sites
  6. 2026-06-19HCPA
    Captured HCPA_0988180000_bbba2202 from hcpa
  7. 2026-06-25FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_88085761 from fdep_cleanup_sites
  8. 2026-06-26HCPA
    Captured HCPA_0988180000_54416109 from hcpa
  9. 2026-06-29HCPA
    Captured HCPA_0988180000_27948f74 from hcpa
  10. 2026-07-04HCPA
    Captured HCPA_0988180000_42b4b6f4 from hcpa
  11. 2026-07-04HCPA
    Captured HCPA_0988180000_94beb3de from hcpa
  12. 2026-07-06HCPA
    Captured HCPA_0988180000_92e4fc00 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
6.4 mi
Round trip
12.9 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa6.4 mi12.9
quarryCentral State Aggregates LLCZephyrhill16.4 mi32.7
quarryCaloosa MaterialsRuskin22.3 mi44.7
quarryGeorgia Stone Spring Hill QuarryAtlanta 24.9 mi49.9
sand pitCounty Line MineSpring Hill28.7 mi57.5
quarryFour CornersLithia35.5 mi71.1
quarryBrooksville QuarryBrooksville38.6 mi77.1
quarryBrooksville South Cement PlantBrooksville38.9 mi77.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
NEWSTAR ACQUISITION LLC

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
fdep_cleanup_sitesFDEP_CLEANUP_877997412026-05-28Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_878610932026-06-04Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_879224142026-06-10Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_879428512026-06-11Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_879837162026-06-15Open ↗
hcpaHCPA_0988180000_bbba22022026-06-19Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_880857612026-06-25Open ↗
hcpaHCPA_0988180000_544161092026-06-26Open ↗
hcpaHCPA_0988180000_27948f742026-06-29Open ↗
hcpaHCPA_0988180000_42b4b6f42026-07-04Open ↗
hcpaHCPA_0988180000_94beb3de2026-07-04Open ↗
hcpaHCPA_0988180000_92e4fc002026-07-06Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
0988180000
Strap
A-23-28-18-3E9-000033-00001.1
Address
1301 W WATERS AVE, TAMPA
Zip
33604
Acreage
0.04 ac
Sq ft
1,731
Homestead
NO
Owner of record
NEWSTAR ACQUISITION LLC
Last sale
2023-01-09
$100(transfer)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/27948f74