Leads/27489fd4
Approved · unknownPinellas County

FDOT — SR 686 FROM W OF BELCHER RD TO E OF US 19 - RESURFACING

Pinellas County — FDOT Contract T7565

Load estimate pending
Lifecycle
Active as of Aug 25, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT — SR 686 FROM W OF BELCHER RD TO E OF US 19 - RESURFACING

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$8.0M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — SR 686 FROM W OF BELCHER RD TO E OF US 19 - RESURFACING. Vendor: HUBBARD CONSTRUCTION COMPANY. Cost: $7,978,009. | FDOT public project (+15) | size signal: $7,978,009 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $7,978,009 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $7,978,009 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $7,978,009 valuation (+20) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_T7565_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
18.0 mi
Round trip
36 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa18.0 mi36
quarryCaloosa MaterialsRuskin23.4 mi46.7
quarryCentral State Aggregates LLCZephyrhill33.4 mi66.9
quarryGeorgia Stone Spring Hill QuarryAtlanta 35.8 mi71.6
sand pitCounty Line MineSpring Hill37.1 mi74.1
quarryWingate Creek MineLithia47.3 mi94.6
quarryFour CornersLithia48.0 mi95.9
quarryBrooksville QuarryBrooksville49.4 mi98.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_T7565_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Pinellas
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/27489fd4