Leads/27424293
Approved · application_filedHillsborough County

Hyatt Studios - Brandon

SWFWMD ERP — site address pending

~62loads
fill dirt
≤1 wk
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

Hyatt Studios - Brandon

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$340K
Actual — from source record
Acreage
0.556 ac
Parcel 0720350000
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
AC PROPERTIES 6 LLC
Why this is a hauling opportunity: Base unknown/other (20) | size signal: $340,090 valuation, ~62 est. loads (+6)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_934860 from swfwmd_erp
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_2029302HL000002000220U_27424293 from fl_dor_cadastral
  3. 2026-06-03HCPA
    Captured HCPA_0720350000_27424293 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
5.7 mi
Round trip
11.5 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa5.7 mi11.5
quarryCaloosa MaterialsRuskin16.4 mi32.9
quarryCentral State Aggregates LLCZephyrhill19.4 mi38.8
quarryFour CornersLithia25.7 mi51.4
quarrySouth Pasture MineLithia31.3 mi62.6
quarryWingate Creek MineLithia32.6 mi65.2
quarryGeorgia Stone Spring Hill QuarryAtlanta 32.9 mi65.7
sand pitCounty Line MineSpring Hill37.4 mi74.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
AC PROPERTIES 6 LLC

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9348602026-05-17Open ↗
fl_dor_cadastralFDOR_2029302HL000002000220U_274242932026-05-28Open ↗
hcpaHCPA_0720350000_274242932026-06-03Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
0720350000
Strap
U-30-29-20-2HL-000002-00022.0
Address
S 301 HWY, TAMPA
Zip
33619
Acreage
0.556 ac
Sq ft
24,218
Homestead
NO
Owner of record
AC PROPERTIES 6 LLC
Last sale
2019-05-29
$1,000,000

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/27424293