Bushnell Truss - Webster Plant Site Improvements
7795 State Road 471, Webster, FL, 33597
Qualifying 65
HotStrongWarmQualifying
permit issuedunknownother
Score breakdown — 65/100
+
3 Contractors Linked
Known companies — contact info available for outreach
Scope signals
- Permit types
- SWFWMD ERP (Individual)
- Permit status
- Issued
- acres disturbed
- 14.055
- Est. notes
- Only excavated soils of SP or SP-SM shall be retained on-site for fill; clay soils shall be disposed of off-site per demolition notes. No earthwork cut/fill summary table was found in the plan set; a separate geotechnical report (AEI CPGT-25-214) is referenced for foundation undercutting and backfill specifications. CY
- Est. source
- swfwmd_erp_plans CY
- Est. drainage features
- 1 wet detention pond (TOB=87.00,NWL=83.50,SHWL=79.50,BOTTOM=78.50); multiple swales (treatment swale,runoff bypass swales,20-ft wide swale with 8-ft bottom,30-ft wide swale with 10-ft bottom,15-ft wide swale with 4:1 max side slopes,spreader swale); 1 outfall control structure (modified FDOT Type E,weir=83.9,inv=82.0); 1 Contech water polisher; multiple Type F inlets (at least 8 visible on grading plan); 2 mitered end sections; 1 storm manhole CY
- Est. extraction method
- claude_vision CY
- Est. utility lengths lf
- [object Object] CY
- Est. grading max change ft
- 11 CY
- Jurisdiction
- Webster, FL
Company roles
Owner/Developer
ZMK Holdings, LLC
Owner/Developer
Bushnell Truss Enterprises, LLC
Engineer of Record
Clymer Farner Barley, Inc.
Source records
swfwmd_erpSWFWMD_ERP_931750
View Sourceswfwmd_erp_plansSWFWMD_PLANS_931750_2515beee
View Source