Leads/24c877de
Approved · planning

REMOVE INSTALL UTILITY POLES

5400 LAUREL RD E, NOKOMIS, FL, 34275

Load estimate pending
Lifecycle
Permitted as of Feb 13, 2018
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

REMOVE INSTALL UTILITY POLES

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
FLORIDA POWER AND LIGHT COMPANY
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, but stale (8y old)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21FDEP_ERP
    Captured FDEP_ERP_0204616-004-EG from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Florida Shell & Fill Company LLC · Naples
One-way
13.6 mi
Round trip
27.1 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
quarryFlorida Shell & Fill Company LLCNaples13.6 mi27.1~55m$140–$175
sand pitWashington Loop MinePunta Gorda28.7 mi57.3~100m$230–$290
quarryWingate Creek MineLithia29.2 mi58.4~100m$230–$290
quarryBermont Materials AlicoPunta Gorda30.3 mi60.5~100m$230–$290
quarry4M-31 MineAlva31.8 mi63.7~100m$230–$290
sand pitWatermelon PitPunta Gorda38.8 mi77.6~100m$230–$290
quarryHalls MineNaples39.0 mi78~100m$230–$290
quarryCaloosa MaterialsRuskin39.2 mi78.3~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
FLORIDA POWER AND LIGHT COMPANY

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0204616-004-EG2026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/24c877de