Leads/21e441be
Approved · unknownHillsborough County

Mitigation bank — Alafia River Mitigation Bank (468 ac)

Alafia River Mitigation Bank, Hillsborough County, FL

Load estimate pending
Lifecycle
Permitted as of Apr 2, 2018
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Mitigation bank — Alafia River Mitigation Bank (468 ac)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 4/2/2018 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Mitigation bank — 468 ac of wetland restoration. Multi-year project with fill / grading / water control structures. Contact: Victoria Bruce. | stage=permit_issued, but stale (8y old) | single-trade residential permit — capped low | stage=permit_issued, but stale (8y old) | single-trade residential permit — capped low | stage=permit_issued, but stale (8y old) | single-trade residential permit — capped low | stage=permit_issued, but stale (8y old) | single-trade residential permit — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_MITIGATION_BANKS
    Captured FDEP_MITBANK_41686 from fdep_mitigation_banks

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
15.6 mi
Round trip
31.2 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa15.6 mi31.2
quarryFour CornersLithia16.0 mi31.9
quarryCaloosa MaterialsRuskin19.7 mi39.3
quarrySouth Pasture MineLithia22.3 mi44.7
quarryCentral State Aggregates LLCZephyrhill22.9 mi45.7
quarryWingate Creek MineLithia27.0 mi54.1
quarrySouth Fort Meade MineLithia31.4 mi62.7
quarryGeorgia Stone Spring Hill QuarryAtlanta 39.0 mi78
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
fdep_mitigation_banksFDEP_MITBANK_416862026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Hillsborough
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/21e441be